代写essay,代写assignment,DRS英国论文代写留学推荐网站

代寫assignment服務

五年專注珀斯代寫assignment 信譽保證
turnitin檢測 保證原創率 高分通過

本公司成立以來,在assignment代寫領域獲得了不錯的口碑,98%以上的客戶順利通過..歡迎大家進行咨詢和享受公司為你提供的全方位服務!不論你的assignment有多難,deadline有多急,我們將給你帶來最專業可靠的代寫assignment服務。

Order Now

澳洲最好的代寫在哪里? 請上bgbonus.com 包你

    這個assignment太難了 自己不想寫. 又不想fail. 怎么辦呢, 只能找bgbonus.com 幫忙解決了.輕松滿足你的代寫要求
    BLDG2101 – INDUSTRIAL CONSTRUCTION
    Major Assignment
    This Major Assignment is worth 40% of your final mark.
    Groups of 3 students must be formed at the beginning of the course.
    MAJOR ASSIGNMENT –YOUR BRIEF
    You are to research and author a detailed and annotated pictorial report on the construction of an
    industrial building currently under construction or newly constructed. (Approach a building
    company for newly built industrial buildings).
    The object of this research is to help familiarise the students with industrial construction
    techniques and management methods. A particular focus should be taken on the construction
    techniques used and how different building interfaces interact. This assignment will also help
    prepare the students for participating in class discussions during the semester
    It is the responsibility of each group to determine how they will approach the research. IT IS
    IMPORTANT TO DECIDE ON YOUR REPORT FORMAT AND RESEARCH APPROACH
    IMMEDIATELY, SO THAT THE REPORT IS SET OUT CONSISTENTLY.
    THE REPORT FORMAT
    The report should cover the following elements within your chosen case study as listed
    below:
    • Project Details (10 marks)
    ?
    Client
    ?
    Managing Contractor (MC)
    ?
    Contract Type (Design and Construct)
    ?
    Top 5 Subcontractors used on the Project
    ?
    Site size
    ?
    Structure being built
    ?
    Cost of Project
    ?
    End use
    • Pre-Construction Planning (30 marks)
    ?
    Explain the chosen method of entry, exit and site accommodation
    location for the project. Why was the chosen setup effective?
    ?
    Identifying site construction constraints
    ?
    Identify and explain two documents used for ensuring safety on site.
    • Main Support Structure (30 marks)
    ?
    What type of foundation system was used?
    ?
    What type of structure was used?
    ?
    Detail and explain (with details) connections between horizontal and
    vertical main members
    • Services (20 marks)
    ? Detail how fire protection has been designed for the chosen facility
    ? Detail how the mechanical ventilation system has been designed
    for the chosen facility.
    ? Explain how both these systems have been constructed and
    installed?
    • Conclusion (10 marks)
    ? Explain, giving 2 examples, how the contractor could have
    improved the delivery of this project?

在線客服

售前咨詢
售后咨詢
微信號
Essay_Cheery
微信
Assignment代写,【essay代写】美国作业代写-留学代写ESSAY网 Dueduedue论文服务-【美国论文代写】加拿大论文ESSAY代写服务 ESSAYCASE |essay代写|assignment代写|paper代写,全球在线写作中心 EasyDue™-北美地区论文作业ESSAY代写服务机构,作业代写-覆盖100+全学科 EssayBerry:美国论文ESSAY代写服务,代写essay,统计代写,代写文章 EssayWill-论文代写网|经济代写,数学,CS代写,Assignment代写 Essaymint:专注软文代写和代写作业等服务|作业代写-100%原创高分 Essay代写,论文代写,Report代写,网课代修-浩天教育 Essay代写-Assignment「免费修改」Paper代写,-51Due留学教育 Essay代写-各学科论文代写|留学作业网课代修代做|优质的代写文章的网站